
Another element of the Eagle project was the installation of 4 benches along the trail. Each bench is spaced by 1/4 mile allowing users to gauge their distance, at least for the first mile. Luckily 3 of the bridges happened to be at stream crossings which provide a scenic place to catch a breath.

The final touch of the Eagle project was the replacement of this sign for Spanish Fork Peak.

We returned later to cut some texture into the bridge as a safety precaution.

No comments:
Post a Comment